Surpassing rigorous technical standards, HT Energy is proud to announce the completion of a custom-built Pump Skid unit for industrial maintenance. This achievement highlights the end-to-end self-sufficiency of our engineering team, from initial design to final execution.
Optimization Through In-House Capability
Instead of opting for off-the-shelf commercial equipment, HT Energy developed this Pump Skid based on the specific demands of our current projects. This in-house approach allowed us to:
- Achieve precise technical configurations tailored to job requirements.
- Optimize investment costs.
- Enhance practical expertise for our engineers in fabricating complex skid systems.
While this is not our first skid, it is our largest to date and represents our highest level of finishing quality. The entire workflow—including basic design, procurement, mechanical fabrication, and testing—was performed entirely in-house.
Ready for Offshore Deployment
The system has entered the Commissioning phase and is ready for mobilization to offshore campaigns.
Key Technical Specifications (HPU for Oil Flushing):
- Flow Rate: 120 m³/h
- Operating Pressure: 7 bar
- Main Pump: Ebara 100×80 IFWM
- Motor: 30 kW, 380V
- Oil Tank: 1,400 Liters (Stainless Steel)
- Heating System: 30 kW Electric
- Filtration: 1 / 3 / 5 micron (Using Parker G2 filters)
- Protection System: Automatic shutdown for overpressure, overheating, or low flow.
Mastering this fabrication technology not only ensures HT Energy’s operational independence but also reaffirms our commitment to providing optimal technical solutions for our clients.
